Motorists traveling through Biglerville should expect delays beginning today as a pavement repair and resurfacing project gets underway on two of the borough’s main roadways.
According to PennDOT, weather permitting, preparatory work is scheduled to begin today, Thursday, July 16, on York Street and North Main Street.
Drivers can expect lane restrictions controlled by flaggers, along with periodic traffic stoppages lasting several minutes while crews work.
The project includes resurfacing sections of York Street through the borough and a portion of North Main Street near the Route 34 intersection.
PennDOT is urging motorists to remain alert while traveling through the work zone, obey all posted signs and directions from flaggers, and use extra caution to protect both highway workers and fellow travelers. Traffic backups may occur.
The work is weather-dependent, and the schedule may change if conditions are unfavorable.
PennDOT reminds motorists that slowing down and remaining attentive in work zones helps improve safety for everyone and can reduce the risk of crashes involving road crews and other drivers.
Source: PennDOT, Biglerville Borough